Considerations To Know About site acceptance test (sat)
Initiate the boot-up course of action for engineering and operator workstations According to the producer’s Guidelines.After the site has long been cleaned and all fixtures are actually put in, an interior box tension and air flow Test is done. This test is executed making sure that the Area is properly pressurized and There exists satisfactory v